Executive Summary
SE5 Construction is committed to showcasing our expertise, vast experience, and consistent success in your industry. We believe that our partnership with us can be instrumental in the successful completion of your project.
Our core values revolve around transparency, adaptability, and continuous communication. Our primary goal is to ensure the safe and timely completion of your project, emphasizing rigorous health and safety protocols and delivering a top-tier finish.
Our response to the inquiry document is comprehensive, addressing all tender deliverables and providing necessary details and evidence. We're eager to delve deeper into any additional information you might need and discuss our proposal in more detail.


Proactive Approach
Dedicated Team
Our dedicated site team, experienced in both showroom and non-showroom settings, is adept at collaborating closely with client teams, subcontractors, and other stakeholders.
Thorough
We've conducted a comprehensive site visit to understand the environment and pinpoint challenges like access points and the need to coordinate with neighbouring tenants.

Quality Assured
Our in-house management, in collaboration with our trusted supply chain partners, guarantees superior control, quality assurance, and value.
We have ISO9001 & Herculaes acreditation.
Form of Tender
Dear Sir/Madam,
I I/We, having read the Conditions of Contract and The Employers Requirement Document delivered to me / us
and having examined the drawings and other documents referred to therein do hereby offer to execute and
complete in accordance with the conditions of contract the whole of the works described for the sum(s) stated
below:-
OPTION 1 Fully compliant bid for completed works as tender (to be completed by all Tenderers)
for the VAT exclusive sum of two million, seven hundred and sixty four thousand, eight hundred and five pounds and nineteen pence.
and within (23) calendar weeks from the date of possession of the site.
£2,764,805.19
Estimate Basis
1042-2-309 Detail Sections- Architraves and skirtings
1042-2-310 Joinery details - Parts counter
1042-2-311 Detail Sections- Bulkheads & Walls
1042-2-312 Feature wall details
1042-2-313 Moveable partition details
1042-2-314 LGF-Kitchen WC Plans & Elevations
1042-2-315 GF-Kitchen WC Plans & Elevations
1042-2-316 GF-Kitchen, WC Plans & Elevations
1042-2-317 FF-Kitchen, WC Plans & Elevations
1042-2-318 SF-Kitchen,WC Plans & Elevations
1042-2-330 MOT Bay details
1042-2-331 Wash Bays
1042-2-401 Mezzanine details - Parts
1042-2-402 Mezzanine details - Plant
1042-2-601 Internal Elevations - Cafe
1042-2-602 Glazed Partitions
1042-2-603 Internal Elevations Second floor
1042-2-603 Internal Elevation Lower Ground floor
1042-2-610 Internal Door and Screens
1042-2-611 Internal Door and Screens
1042-2-612 Internal Door and Screens
1042-2-613 Internal Door and Screens
1042-2-108 SF- Plan - Setting Out
1042-2-102 LGF - Plan - Setting out
1042-2-103 GF - Plan - References
1042-2-104 GF - Plan - Setting Out
1042-2-105 FF- Plan - References
1042-2-106 FF - Plan - Setting Out
1042-2-107 SF- Plan - References
1042-2-101 LGF - Plan - References
1042-2-109 Roof Plan
1042-2-110 LGF - Mezzanine - References
1042-2-111 LGF - Floor Finishes Plan
1042-2-112 GF - Floor Finishes Plan
1042-2-113 FF - Floor Finishes Plan
1042-2-114 SF - Floor Finishes Plan
1042-2-115 LGF- Wall Finishes Plan
1042-2-116 GF- Wall Finishes Plan
1042-2-117 FF- Wall Finishes Plan
1042-2-118 SF- Wall Finishes Plan
1042-2-119 LGF - Ceiling Plan
1042-2-120 GF - Ceiling Plan
1042-2-121 FF - Ceiling Plan
1042-2-122 SF - Ceiling Plan
1042-2-204 Sections 1042-2-205 Section
1042-2-301 Staircase 1 & Lift - Details 1042-2-302 Staircase 2
1042-2-303 Staircase 3 1042-2-304 Escalators
Exclusions
01
We have excluded any Metal Column Casings to the Lower Ground floor as the drawings are unclear - we have included padded column protectors where shown.
02
We have made no allowance for the movement of any manholes or drainage in the lower ground floor as the existing slab is a waterproof construction and any modifications would invalidate the warranty.
03
We have assumed the slab has been strengthened in the areas of the mezzanines and we have made no allowance for same.
04
We have allowed for the Tanking detail to wall tiling to 2.4m on Lower Ground Only We have used an alternative Roller Shutter Door Supplier for all of the roller shutters with the exception of the high speed door.
05
We have not allowed for convex mirrors to MOT Bay We assumed that BREEAM is included in the 15% fees
06
We have not made any allowances for applied DPM to concrete slabs as we have assumed the RH will be at the required level to suit all floor finishes.
07
We have based our price on the assumption that the design team will be novated - and we will be provided with copies of the consultants' appointments together with an acceptable worded novation agreement .
08
We have excluded terrorism cover at this stage
09
We have included for the following secondary steelwork items: Steelwork trims to escalator void (as per drawings), All SHS and bracketry for the general staircase balustrading (as per drawings)
Costs
Area | Cost |
Land Remediation | £500,000 |
Site Prep | £150,000 |
Foundations | £250,000 |
Structural Steelwork | £300,000 |
Roofing | £150,000 |
Cladding & Glazing | £200,000 |
Interior Finishes | £180,000 |
Electrical & Lighting | £150,000 |
HVAC | £120,000 |
Plumbing & Restrooms | £80,000 |
Security Systems | £70,000 |
Landscape & Parking | £200,000 |
Fixtures & Fittings | £100,000 |
Signage & Branding | £60,000 |
IT & Networking | £90,000 |
OHP | £270,000 |
£2,700,000 |

Programme of Work
June 23
Area |
Land Remediation |
Site Prep |
Foundations |
Structural Steelwork |
Roofing |
Cladding & Glazing |
Interior Finishes |
Electrical & Lighting |
HVAC |
Plumbing & Restrooms |
Security Systems |
Landscape & Parking |
Fixtures & Fittings |
Signage & Branding |
IT & Networking |
Jan 23
Feb 23
Mar 23
April 23
May 23
July 23
4D Construction Plan
Download
Project Team
Office / Visiting
James Edwards
Projects Director
Download CV
On Site

Dee Forster
Snr Project Mgr
Download CV

Chris Hopkins
Commercial Mgr
Download CV

Willian Souza
Project Mgr
Download CV

Christina Wright
SH&E Mgr
Download CV



Craig Tan
Night Manager
Download CV
Paul Wilney
Site Manager
Download CV
Clay Elliot
Cost Manager
Download CV


Emmanuel Ikwuegbu
Assistant Site Mgr
Download CV
Quality Management
Our Quality System fully meets the requirements of ISO9001:2008, ISO18001 and ISO14001. The application of this Quality Management System covers all aspects of our business and is administered by the Systems Manager. The Quality Management System has been developed in accordance with British Standard BS EN ISO 9001:2004 and applies to all Projects carried out by the company. Registration of the company’s Quality Systems applies to the activities and locations of the organisation identified on registration documents.
SE5 team members will champion responsibility and ensure that both the client’s and design team’s expectations are met. It is important to employ the right subcontractor, giving him sufficient time and the right environment to undertake his work and manage this from start to finish ensuring that the finished work is completed to the highest standard. SE5 Construction appreciates that first impressions count for everything, and we will ensure that only the best materials, installed by the most competent contractors are used for this project. We are committed to achieving the highest quality end product that will deliver the ‘wow’ factor desired and deserved by our client. We propose to utilise tried and tested procedures with some new initiatives, managed by staff with a proven track record of delivering quality products. We will carry out validation exercises throughout the procurement and construction phases to ensure that the highest quality is achieved, thus enabling us to provide a ‘defect-free’ end product to our client.
ISO Cert
Achillies Cert
Quality Policy
Insurances




Partner with us
SE5
Construction
Mailing Address
45 The Street, Southwark, SE5 RJ6
Email Address
hello@se5construction.com
Phone Number
(123) 456 7890