Tender Submission - January 2023

four circle glyph icon
Letter S Logo

About SE5

Construction manager architect checking plan on construction site.
Letter S Logo
Letter S Logo

Founded in 1975, SE5 is a leading construction firm, guiding clients from initial design to final build, ensuring their vision becomes a reality. All our projects adhere to world-class standards, offering quality construction at affordable rates.

View Protfolio

Right Arrow Head Icon

Get In Touch

Letter S Logo

Executive Summary

SE5 Construction is committed to showcasing our expertise, vast experience, and consistent success in your industry. We believe that our partnership with us can be instrumental in the successful completion of your project.


Our core values revolve around transparency, adaptability, and continuous communication. Our primary goal is to ensure the safe and timely completion of your project, emphasizing rigorous health and safety protocols and delivering a top-tier finish.


Our response to the inquiry document is comprehensive, addressing all tender deliverables and providing necessary details and evidence. We're eager to delve deeper into any additional information you might need and discuss our proposal in more detail.


James Edwards

Projects Director

Minimalist Room Interior

Proactive Approach

Dedicated Team

Our dedicated site team, experienced in both showroom and non-showroom settings, is adept at collaborating closely with client teams, subcontractors, and other stakeholders.

Thorough

We've conducted a comprehensive site visit to understand the environment and pinpoint challenges like access points and the need to coordinate with neighbouring tenants.

Interior of modern house with staircase

Quality Assured

Our in-house management, in collaboration with our trusted supply chain partners, guarantees superior control, quality assurance, and value.


We have ISO9001 & Herculaes acreditation.

Letter S Logo

Form of Tender

Dear Sir/Madam,


I I/We, having read the Conditions of Contract and The Employers Requirement Document delivered to me / us

and having examined the drawings and other documents referred to therein do hereby offer to execute and

complete in accordance with the conditions of contract the whole of the works described for the sum(s) stated

below:-


OPTION 1 Fully compliant bid for completed works as tender (to be completed by all Tenderers)

for the VAT exclusive sum of two million, seven hundred and sixty four thousand, eight hundred and five pounds and nineteen pence.






and within (23) calendar weeks from the date of possession of the site.

£2,764,805.19

Estimate Basis

1042-2-309 Detail Sections- Architraves and skirtings

1042-2-310 Joinery details - Parts counter

1042-2-311 Detail Sections- Bulkheads & Walls

1042-2-312 Feature wall details

1042-2-313 Moveable partition details

1042-2-314 LGF-Kitchen WC Plans & Elevations

1042-2-315 GF-Kitchen WC Plans & Elevations

1042-2-316 GF-Kitchen, WC Plans & Elevations

1042-2-317 FF-Kitchen, WC Plans & Elevations

1042-2-318 SF-Kitchen,WC Plans & Elevations

1042-2-330 MOT Bay details

1042-2-331 Wash Bays

1042-2-401 Mezzanine details - Parts

1042-2-402 Mezzanine details - Plant

1042-2-601 Internal Elevations - Cafe

1042-2-602 Glazed Partitions

1042-2-603 Internal Elevations Second floor

1042-2-603 Internal Elevation Lower Ground floor

1042-2-610 Internal Door and Screens

1042-2-611 Internal Door and Screens

1042-2-612 Internal Door and Screens

1042-2-613 Internal Door and Screens

1042-2-108 SF- Plan - Setting Out

1042-2-102 LGF - Plan - Setting out


1042-2-103 GF - Plan - References

1042-2-104 GF - Plan - Setting Out

1042-2-105 FF- Plan - References

1042-2-106 FF - Plan - Setting Out

1042-2-107 SF- Plan - References

1042-2-101 LGF - Plan - References

1042-2-109 Roof Plan

1042-2-110 LGF - Mezzanine - References

1042-2-111 LGF - Floor Finishes Plan

1042-2-112 GF - Floor Finishes Plan

1042-2-113 FF - Floor Finishes Plan

1042-2-114 SF - Floor Finishes Plan

1042-2-115 LGF- Wall Finishes Plan

1042-2-116 GF- Wall Finishes Plan

1042-2-117 FF- Wall Finishes Plan

1042-2-118 SF- Wall Finishes Plan

1042-2-119 LGF - Ceiling Plan

1042-2-120 GF - Ceiling Plan

1042-2-121 FF - Ceiling Plan

1042-2-122 SF - Ceiling Plan

1042-2-204 Sections 1042-2-205 Section

1042-2-301 Staircase 1 & Lift - Details 1042-2-302 Staircase 2

1042-2-303 Staircase 3 1042-2-304 Escalators

Letter S Logo

Exclusions

01

We have excluded any Metal Column Casings to the Lower Ground floor as the drawings are unclear - we have included padded column protectors where shown.

02

We have made no allowance for the movement of any manholes or drainage in the lower ground floor as the existing slab is a waterproof construction and any modifications would invalidate the warranty.

03

We have assumed the slab has been strengthened in the areas of the mezzanines and we have made no allowance for same.

04

We have allowed for the Tanking detail to wall tiling to 2.4m on Lower Ground Only We have used an alternative Roller Shutter Door Supplier for all of the roller shutters with the exception of the high speed door.

05

We have not allowed for convex mirrors to MOT Bay We assumed that BREEAM is included in the 15% fees

06

We have not made any allowances for applied DPM to concrete slabs as we have assumed the RH will be at the required level to suit all floor finishes.

07

We have based our price on the assumption that the design team will be novated - and we will be provided with copies of the consultants' appointments together with an acceptable worded novation agreement .

08

We have excluded terrorism cover at this stage

09

We have included for the following secondary steelwork items: Steelwork trims to escalator void (as per drawings), All SHS and bracketry for the general staircase balustrading (as per drawings)

Costs

Area

Cost

Land Remediation

£500,000

Site Prep

£150,000

Foundations

£250,000

Structural Steelwork

£300,000

Roofing

£150,000

Cladding & Glazing

£200,000

Interior Finishes

£180,000

Electrical & Lighting

£150,000

HVAC

£120,000

Plumbing & Restrooms

£80,000

Security Systems

£70,000

Landscape & Parking

£200,000

Fixtures & Fittings

£100,000

Signage & Branding

£60,000

IT & Networking

£90,000

OHP

£270,000


£2,700,000

Letter S Logo

£500,000

£400,000

£300,000

£200,000

£100,000

£0

Land Remediation

Site Prep

Foundations

Structural Steelwork

Roofing

Cladding & Glazing

Interior Finishes

Electrical & Lighting

Plumbing & Restrooms

HVAC

Security Systems

Landscape & Parking

Fixtures & Fittings

Signage & Branding

IT & Networking

OHP

Letter S Logo

Programme of Work

Letter S Logo

June 23

Area

Land Remediation

Site Prep

Foundations

Structural Steelwork

Roofing

Cladding & Glazing

Interior Finishes

Electrical & Lighting

HVAC

Plumbing & Restrooms

Security Systems

Landscape & Parking

Fixtures & Fittings

Signage & Branding

IT & Networking

Jan 23

Feb 23

Mar 23

April 23

May 23

July 23

Letter S Logo

4D Construction Plan

Download Icon

Download

Project Team

Office / Visiting

James Edwards

Projects Director

Download CV

cv  resume  profile  staff  employee

On Site

Dee Forster

Snr Project Mgr

Download CV

cv  resume  profile  staff  employee

Chris Hopkins

Commercial Mgr

Download CV

cv  resume  profile  staff  employee

Willian Souza

Project Mgr

Download CV

cv  resume  profile  staff  employee

Christina Wright

SH&E Mgr

Download CV

cv  resume  profile  staff  employee

Craig Tan

Night Manager

Download CV

cv  resume  profile  staff  employee

Paul Wilney

Site Manager

Download CV

cv  resume  profile  staff  employee

Clay Elliot

Cost Manager

Download CV

cv  resume  profile  staff  employee

Emmanuel Ikwuegbu

Assistant Site Mgr

Download CV

cv  resume  profile  staff  employee

Quality Management

Letter S Logo

Our Quality System fully meets the requirements of ISO9001:2008, ISO18001 and ISO14001. The application of this Quality Management System covers all aspects of our business and is administered by the Systems Manager. The Quality Management System has been developed in accordance with British Standard BS EN ISO 9001:2004 and applies to all Projects carried out by the company. Registration of the company’s Quality Systems applies to the activities and locations of the organisation identified on registration documents.


SE5 team members will champion responsibility and ensure that both the client’s and design team’s expectations are met. It is important to employ the right subcontractor, giving him sufficient time and the right environment to undertake his work and manage this from start to finish ensuring that the finished work is completed to the highest standard. SE5 Construction appreciates that first impressions count for everything, and we will ensure that only the best materials, installed by the most competent contractors are used for this project. We are committed to achieving the highest quality end product that will deliver the ‘wow’ factor desired and deserved by our client. We propose to utilise tried and tested procedures with some new initiatives, managed by staff with a proven track record of delivering quality products. We will carry out validation exercises throughout the procurement and construction phases to ensure that the highest quality is achieved, thus enabling us to provide a ‘defect-free’ end product to our client.





Ian Chelmsworth

Quality Manager

ISO Cert

Right Arrow Head Icon

Achillies Cert

Right Arrow Head Icon

Quality Policy

Right Arrow Head Icon

Insurances